s,
(including its Location and Type).
Facility
Annual Operating Period –
The
Facility Annual Operating Period is the period during which the water
system facility operates over a specified period of time, as defined
by a starting month and day (Start MM/DD ), an ending month and day
End MM/DD ),and an effective period . For
example, a water system facility may operate seasonally from January
15 to March 15. Two years later, the water system notifies the state
that the facility no longer operates during that seasonal period. The
Effective Begin date for the January 15-March 15 period would be
January 1, 2003, and the Effective End date would be December 31,
2004.
Facility Annual Operating Periods may not overlap.
Start Month
Start Day
End Month
End Day
Effective Begin Date
Effective End Date
Pressing the Summarized Field Sample Results link displays the
Summarized Field Sample Results List (list of MDBP Summaries) for
this water system facility.
Pressing the Facility Analyte Level List link displays the
Facility Analyte Level List for this water system facility.